Customization: | Available |
---|---|
Application: | Air Condition, Automobile, Water Heater |
Shape: | Square |
Still deciding? Get samples of US$ 50/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
3102 H112 Extrusion Micro-channel Aluminum Flat Tube
Commonly used material chemical composition
No. | Alloy | Si | Fe | Cu | Mn | Mg | Cr | Zn | V | Ti |
1 | 1050 | ≤0.25 | ≤0.40 | ≤0.05 | ≤0.05 | ≤0.05 | --- | ≤0.05 | ≤0.05 | ≤0.03 |
2 | 1100 | ≤0.95(Si+Fe) | 0.05-0.20 | ≤0.05 | --- | --- | ≤0.10 | --- | --- | |
3 | 3102 | ≤0.40 | ≤0.70 | ≤0.10 | 0.05-0.40 | --- | --- | ≤0.30 | --- | ≤0.10 |
4 | 3003 | ≤0.15 | ≤0.15 | ≤0.01 | 0.90-1.10 | ≤0.03 | ≤0.03 | ≤0.05 | ≤0.05 | ≤0.05 |
Supply state and mechanical properties
Alloy | Temper | Tensile Strength | Yield Strength | Elongation |
1050 | O/F/H111/H112 | ≥65MPa | ≥20MPa | ≥25% |
1100 | O/F/H111/H112 | ≥75MPa | ≥20MPa | ≥25% |
3102 | O/F/H111/H112 | ≥75MPa | ≥20MPa | ≥25% |
3003 | O/F/H111/H112 | ≥75MPa | ≥20MPa | ≥25% |
Product Name
|
Aluminium tubing/tube
|
Material
|
1050.1050A.1060.1070.1070A.1100.1200.3003.4043.491.5005.5A05.5A06 5083.6061.6063
|
Temper
|
O H12.H14.H16.H18.H22.H24.H26.F
|
Standard
|
GB/T 20250-2006 Q/HJ 007-06 YS/T 67-2012 GB/T 5584-2009/3954-2008 GB/T 8733 2007etc
|
Size
|
width:6mm-40mm
|
Height:0.8mm-8.00mm
|
|
Wall thinkness:0.12mm Min
|
|
Length:As Request
|
|
Leakage
|
NO,N2 gas keep inside at least 24hours for testing
|
Surface
|
Bright.polished,hair line,brush.and blast.checkered.embossed etc.
|
Characteristic
|
1. Low Weight 2. Good thermal and electricity conductivity 3. Good corrosion resistanc 4. Good forming and bending capablity 5. Comply with ROHS 6. High cycle resue value 7. Narrow tolerance range 8. High surface quality |
Price term
|
Ex-Work,FOB,CNF,CFR,FCA,DDP,DDU,etc
|
Payment Term
|
TT,L/C,D/P,Western Union,paypal,etc
|
Export to
|
Ireland,Singapore,Indonesia,Ukraine,Saudiarabia,Spain,Canada,USA,Brazil,Thailand,Korea,Iran, India,Egypt,Kuwait,Oman,Viet Nam,South Africa,Dubai,England,Holand Russia etc
|
Delivery time
|
1.Immediately delivery after received the payment if goods in stock 2.25-30 working days for normaly producion
|
MOQ
|
1 metric ton
|
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.